Archive for the ‘Manufacturing’ Category

How to optimize copper stock and copper drops?

August 28th, 2009 | Make a comment | Posted in Busbar, Manufacturing
Tags: , ,
copper storage area

copper storage example

.

Practical tips to optimize , reduce copper drop, and win time during projects…

Don’t hesitate to share your own ideas about copper or optimization as comments.

With today high , it’s worth sharing ideas!

Dan

(more…)

Main evolutions of my panel builder organization along the time

April 30th, 2009 | 5 Comments | Posted in Logistics, Manufacturing
Tags: , , , , ,

Mr Alain LEBAS, from LEBAS SYSTEM, France, is describing us the main evolutions of his organisation during the past years.  This is the first part of his testimony.
______________________________________________

optimize flow & surfaces

optimize flow & surfaces

The revolution in the workshop

At the beginning we had 4 assemblers : each was making his purchase and stock separately.
Then we grew and decided to purchase with annual contracts and to globalize and optimise the inventories. This led to a total re-organisation of the surfaces that we decided to implement after internal working groups, just us, without consultants.

[...]

(more…)

Dan The Panel Builder Blog is proudly powered by WordPress
Entries (RSS) and Comments (RSS) and license Creative Commons License

webleads-tracker